Mid-Wis Maple, Day 05



We finished up the bus heater by welding the legs on, then bracing them with some more scrap, then dropped some bolts into the remaining holes and welded them in, too.
Bus Heater

A chunk of steel almost covered the hole in the bottom, that got welded in, too.
Bus Heater


Bus Heater

Bus Heater

Then X torched a hole in the top for a smoke stack...
Bus Heater

...a bore liner from one of the Allis motors brazed into the hole. It's not perfectly straight, but brazing cast iron is ... challenging. It'll work...
Bus Heater

We hauled it back to the sugarbush, installed it and fired it up. Still need to make a better interface to fill the gaps in the window.
Bus Heater

As long as we were back there, we figured we might as well tap some trees--here's Mike, drilling a hole.
Tapping

We actually managed to finish—at least we ran out of pails and taps, so we must be done, right?

It snowed last night, and we hadn't covered the pails, so I'm not sure what we'll find when we go back today.

Next
Home